Quasi-Random Sequences in Visual Basic QuickStart Sample
Illustrates how to generate quasi-random sequences like Fauré and Sobol sequences using classes in the Numerics.NET.Statistics.Random namespace in Visual Basic.
View this sample in: C# F# IronPython
Imports Numerics.NET
Imports Numerics.NET.Random
' Illustrates the use of quasi-random sequences by computing
' a multi-dimensional integral.
Module QuasiRandomSequences
Sub Main()
' The license is verified at runtime. We're using
' a 30 day trial key here. For more information, see
' https://numerics.net/trial-key
Numerics.NET.License.Verify("64542-18980-57619-62268")
' This QuickStart Sample demonstrates the use of
' quasi-random sequences by computing
' a multi-dimensional integral.
' We will use one million points.
Dim length As Integer = 1000000
' The number of dimensions:
Dim dimension As Integer = 5
' We will evaluate the function
'
' Product(i = 1 -> # dimensions) |4 x(i) - 2|
'
' over the hypercube 0 <= x(i) <= 1. The value of this integral
' is exactly 1.
' Create the sequence
Dim sequence = QuasiRandom.HaltonSequence(dimension, length)
' Compute the integral by summing over all points
Console.WriteLine("# iter. Estimate")
Dim sum As Double = 0.0
Dim i As Integer = 0
For Each point As Vector(Of Double) In sequence
If i Mod 100000 = 0 Then
Console.WriteLine("{0,6} {1,8:F4}", i, sum / i)
End If
' Evaluate the integrand
Dim functionValue As Double = 1.0
For j As Integer = 0 To dimension - 1
functionValue *= Math.Abs(4.0 * point(j) - 2.0)
Next
sum += functionValue
i = i + 1
Next
Console.WriteLine($"Final estimate: {sum / length,8:F4}")
Console.WriteLine("Exact value: 1.0000")
' Sobol sequences require more data And more initialization.
' Fortunately, different sequences of the same dimension
' can share much of the work And storage. The
' SobolSequenceGenerator class should be used in this case
Dim skip As Integer = 1000
Dim sobol As SobolSequenceGenerator = New SobolSequenceGenerator(dimension, length + skip)
' Sobol sequences are more flexible: they let you skip
' a number of points at the start of the sequence.
' The cost of skipping points Is O(1).
i = 0
sum = 0.0
For Each point As Vector(Of Double) In sobol.Generate(length, skip)
If i Mod 100000 = 0 Then
Console.WriteLine("{0,6} {1,8:F4}", i, sum / i)
End If
' Evaluate the integrand
Dim functionValue As Double = 1.0
For j As Integer = 0 To dimension - 1
functionValue *= Math.Abs(4.0 * point(j) - 2.0)
Next
sum = sum + functionValue
i = i + 1
Next
' Print the final result.
Console.WriteLine($"Final estimate: {sum / length,8:F4}")
Console.WriteLine("Exact value: 1.0000")
Console.Write("Press any key to exit.")
Console.ReadLine()
End Sub
End Module